Seward Storage Facility - Alaska Railroad Corp.
Seward, Alaska |
 |
Project
Description: This project involved the development of plans for facility and equipment upgrades to increase the rate of rail car unloading, stockpiling, reclaiming, and ship-loading at the Seward Coal Transfer Facility.
Improvements were designed to increase rail car unloading and stockpiling rates were to increase from 3000 TPH to 4800 TPH, while reclaiming and ship- loading rates were projected to increase from 1200 TPH to 2000 TPH.
The scope of the new design included modifications to conveyors, chutes, drives, structures, and electrical systems.
|
Special Issues and Needs:

Saltwater Environmental impacts to equipment.
Services provided:
Mechanical Engineering
Safety Inspection
Equipment Inspection
Conveying Rate Upgrades
Review current operational procedures and systems
Prepare detailed design packages (engineering,
material handling,
structural design)
Prepare equipment specification packages
Develop a Maintenance Program for the facility
|