Engineers & Architects
KO HOME


Architectural

Educational/Institutional
– Proctor Schools
– Rockridge Elementary
– Kirby Plaza Project
– St. Scholastica
– St. Scholastica Housing
– Aftenro Home
– Bemidji State University
– Pike Lake Elementary

Commercial
– KBJR TV6
– North Shore Bank Place
– Colonial Square
– Edgewater Hotel Waterpark
– Hermantown Plaza
– Holappa Office Building
– Link Snacks Headquarters
– Metro Credit Union
– Midtown Professional Bldg

Cultural
– Nett Lake
   Convenience Store
– Bena Community Center
– Bois Forte Public Works
– Leech Lake Early Childhood
– Mille Lacs Gov't Center
– Mille Lacs Housing
– Mille Lacs Wellness Center
– Minishinaakwang
– Nay Ah Shing Renovation
– Bad River Elder Center
– Vermilion Wellness Center

Healthcare/Municipal
– Gnesen Township Fire Hall
– Cornerstone Dental
– Lakeside Dental

Civil

Marine

Mechanical

Structural

Railroad

 

View Complete Portfolio List
   

edgewater hotel & waterpark

edgewater hotel & waterpark

Edgewater Hotel & Waterpark
Duluth, Minnesota

Project Description:Krech Ojard orchestrated this design-build addition and renovation project that more than doubled the size of the Edgewater Hotel in Duluth, Minnesota. The new five story, 9,000 sf per floor hotel addition creates 64 new guest rooms including five jacuzzi suites with gas fireplaces. Half of the new guest rooms overlook the new 18,000 sf Polynesian themed waterpark and half overlook beautiful Lake Superior.

The four story waterpark was provided with exposed laminated wood beam and plank roof structure including a raised roof area to accommodate the two waterpark slide towers. To save on interior space and to add excitement to the waterslides, portions of both four story slides run outside of the building. The existing
4000 sf swimming pool was renovated into additional waterpark space an additional 3,000 sf of the existing hotel was renovated into a kitchen/concession area with a gaming arcade. Three floors of the new hotel were provided with 800 sf meeting rooms with floor to ceiling glass curtain walls on two adjacent sides, providing magnificent views of Lake Superior. Two existing hotel buildings were removed to accommodate additional parking. Analysis and design for storm water management was crucial since impervious surface and water run-off limits were already at their maximum.

.



   

Services provided:
Architecture
Structural



Project Summary::
The Edgewater Hotel addition and waterpark added 54,000 sf of hotel space (64 rooms) and a 18,0000 sf water park. The construction budget was $20 million, was completed late 2005.

 

 

 

Overview
Consumers Energy
Denver Water
Bena Community Center
Download (PDF)
Service List
Architectural
Civil
Marine
Mechanical
Structural
Rail NSTS
General Info
Architecture Dept.
Engineer Dept.