Cenex-Harvest States Grain
Elevator Dock Rehabilitation
Superior, WI |
 |
Project
Description: Krech Ojard was responsible for the reconstruction of 1150 feet of the Cenex-Harvest States loading dock in Superior, WI. The reconstruction of project will be completed in two phases. The first phase involved the 600 foot of dock completed in 2004. The second phase is scheduled for completion in 2008.
Features in the this project included construction of concrete dock supported on wood piles, a 160 foot high grain storage silo’s along dock face and 1150 feet of steel sheet pile bulkhead.
Special issues the Krech Ojard needed to address were loss of lateral support to silo mat piling and soil instability on and around dock.
Only one change order due to as-built being different from original construction drawings.
|
Special
Issues and Needs:
Special issues the Krech Ojard needed to address were loss of lateral support to silo mat piling and soil instability on and around dock.
Services
provided:
• Preliminary design concepts and cost estimates for stabilization of dock and silo mat foundation
• Final repair design specifications, contract documents, and bidding of new sheet pile bulkhead
• Construction QA/QC management
• Review original construction drawings
• Comprehensive inspection and assessment (Level I, II, and III) and report
• Vertical alignment measurements
• Analysis of existing dock structure and grain elevator loads
• Established operating restriction until repairs have been performed
• Full video and still photograph documentation
Project Summary:
The project was completed in 2004 on schedule, to budget, and
to the client's satisfaction.
|