Midwest Energy

Midwest Energy Resources Superior, WI

Project Description:This major facility expansion involved underwater inspection, assessment recommendations and design for an 18,000,000 NT coal transload facility. Included with the design were a steel H pile wharf with reinforced concrete caps and decks, 649 steel H piles to withstand heavy ice loading and vessel impact, and a rail-mounted 12,000 NT/hr shiploader.

 

Special Issues and Needs:
The project required underwater construction management and QA/QC, corrosion and loss analysis, testing and recommendations for a corrosion protection system, and additional services to design and engineer this major facility expansion.

Services provided:
• Completed underwater inspection and assessment.
• Tested ultrasonic thickness gauge.
• Provided static and dynamic structural load analysis.
• Provided berthing analysis.
• Produced a comprehensive report.
• Designed cost-effective structural repairs for damaged and overload piling.
• Prepared a hydrographic survey.
• Designed riprap placement to repair significant vessel scour.

Project Summary:

The project was completed on schedule, to budget, and to the client's satisfaction.

 
link to KOA's GSA portal page
 

 

Overview
Olmsted Dam
Ontario Railroad Announcement
Extreme Home
Bad River Elder Center
Graymont Superior
Download (PDF)
Service List
GSA Advantage
Services
Architectural
Civil
Marine
Mechanical & Electrical
Structural
Rail
General Info
Architecture Dept.
Engineer Dept.