
  |
Port of Erie
Cruise Boat Terminal
Erie, PA |
 |
Project
Description: As a result of the firm’s wide experience with marine structures, Krech Ojard was retained by the Erie Port Authority to provide an independent investigation of a 500’ long seawall failure at the new Cruise Boat Terminal Pier within the Port of Erie. The technical data and recommendations in this report have been used by the Port Authority to negotiate with the original designer and contractor to resolve responsibility for the sudden seawall failure. Subsequent to the failure, Krech Ojard has provided plans, specifications, and on-site construction administration services to complete a Demolition Contract to clear the site of the failed seawall in preparation for the new improvements. Additionally, the Port Authority has retained Krech Ojard to provide ongoing Program Management in planning for reconstruction of the pier site.
|
Special
Issues and Needs:
Krech Ojard has provided plans, specifications, and on-site construction administration services to complete a Demolition Contract to clear the site of the failed seawall in preparation for the new improvements.
Services
provided:
• Forensic engineering of newly built failed structure.
• Performed complete analysis assessment of original design.
• Specifications, plans.
• Detailed report for legal procedures.
• Demolition and salvage plans.
• Program management.
Project Summary:
Krech Ojard was retained by the Erie Port Authority to provide an independent investigation of a 500’ long seawall failure at the new Cruise Boat Terminal Pier within the Port of Erie.
|