South Wind Maritime Center
Mount Vernon, IN |
 |
Project
Description: Krech Ojard performed full structural and stability analysis of mooring structures including 18 mooring cells and 10 mooring dolphins.
KO services included inspection, analysis and repair and rehabilitation drawings. The purpose of our inspection was to determine the current structural condition and the severity of corrosion on this pier in Indiana.
|
Special
Issues and Needs:
The purpose of our inspection was to determine the current structural condition and the severity of corrosion on this pier in Indiana.
Services
provided:
• Structural Engineering
• Marine Engineering
Project Summary:
Krech Ojard performed full structural and stability analysis of mooring structures including 18 mooring cells and 10 mooring dolphins.
|