Engineers & Architects
KO HOME

View Complete Portfolio List

      

Structural Middle School

Shiploader Fatigue Assessment
Midwest Energy Resources,
Duluth/Superior Harbor on Lake Superior

Project Description: Midwest Energy Resources (MERC) provides trans-shipment of over 22-million tons of coal from unit train to 68,000 ton super-laker vessel transport. Critical to this operation is MERC’s 9,000 ton per hour shiploader.

Krech Ojard was hired to provide a detailed analysis and repair/upgrade designs for this 30-year old complex traveling system, which includes a luffing and shuttling boom, as well as an integral traveling tripper system. Over these many years of service, this system has shipped hundreds of millions of tons of coal and is experiencing fatigue cracking of the boom and tail structures.

KO’s Structural and Mechanical Engineers are working on an updated 3-D SolidWorks model of the system, integrating dynamic and fatigue analyses to evaluate the remaining service life of critical details and, where necessary, designing repairs and system upgrades. Our review also considers drive and controls system modifications to minimize operational impacts on loading.

shiploader





   

Special Issues and Needs:
Phased repairs will be implemented during the 3-month annual winter shipping shutdown over the next two years to avoid disruption of coal delivery.

Services provided:
Structural assessment of boom,
   tail, and support frame

• Mechanical system review
• Drive and control system review
• Fatigue and fracture analysis of   primary and critical secondary   structural members.
• SolidWorks modeling of existing
  system and generation of repairs
  with part drawings prepared for
  direct fabrication
• Construction phase support of
  repairs and upgrades.

Project Summary:

Krech Ojard was hired by MERC to provide a detailed analysis and repair/upgrade designs for this 30-year old complex traveling system, which includes a luffing and shuttling boom, as well as an integral traveling tripper system.


spacer bullet extra imagesProject Images:

telescoping model
Stresses in web of main and telescoping booms

cantilever model for shiploader assessment
Stresses in portal main girder under weight of coal

telescoping model
Telescoping support

cantilever model for shiploader assessment
Cantilever section of shiploader


 
link to KOA's GSA portal page
 

 

Overview
Olmsted Dam
NSSR Bridge Replacement
Ontario Railroad Announcement
Extreme Home
Superior Bong Airport
Graymont Superior
Download (PDF)
Service List
GSA Advantage
Services
Architectural
Civil
Marine
Mechanical & Electrical
Structural
Rail
General Info
Architecture Dept.
Engineer Dept.