The current equipment is difficult to maintain with limited access, so a key element of the design is to improve access to the new equipment. 3D modeling of the entire balling process was the approach taken by Krech Ojard to tackle this problem. Working with plant operations and maintenance personnel, existing plant drawings, and some field measurements; a design has been developed that will allow greater productivity and the new larger equipment to be placed with improved access for maintenance within the confines of the existing structure. |
|
||||

Convenience Store 
This project benefitted from the creation of 3d models of existing structures and equipment so that new improved equipment could be designed in place with space designed for maintenance access, something which is missing from existing equipment.