Krech Ojard was responsible for the reconstruction of 1150 feet of the Cenex-Harvest States loading dock in Superior, WI. The reconstruction of project will be completed in two phases. The first phase involved the 600 foot of dock completed in 2004. The second phase was completed in 2008.

Read more details in the Description Tab below.

CENEX HARVEST STATES GRAIN ELEVATOR

Krech Ojard was responsible for the reconstruction of 1150 feet of the Cenex Harvest States loading dock in Superior, Wisconsin. The reconstruction of project will be completed in two phases. The first phase involved the 600 foot of dock completed in 2004. The second phase was completed in 2008.

Features at the Cenex Harvest States loading dock included construction of concrete dock supported on wood piles, a 160 foot high grain storage silo’s along dock face and 1150 feet of steel sheet pile bulkhead.

Special issues the Krech Ojard needed to address at the Cenex Harvest States loading dock were loss of lateral support to silo mat piling and soil instability on and around dock. Only one change order due to as-built being different from original construction drawings. Project was completed on time and within budget.





Services Provided Mechanical Engineering Structural Engineering Marine Handling Rail Engineering Rehabilitation/Maintenance