CN Two Harbors Connector Track

Engineering for planning, design, and construction administration of 4,000± LFT of new track connecting the Two Harbors Subdivision track with a yard track within CN’s Two Harbors Dock Facility to create a loop track with a road bridge over the new track.

Read more details in the Description Tab below.

Canadian National Railway Two Harbors Connector Track

Krech Ojard & Associates provided engineering services for the Two Harbors Connector Track Design at the Canadian National Railway’s (CN) facility in Two Harbors, Minnesota. Project scope included engineering for planning, design, and construction administration for 4,000± LFT of new track connecting the Two Harbors Subdivision track with a yard track within the Two Harbors Dock Facility to create a loop track, with a road bridge over the new track.

KOA approached the project by working with the CN team to develop a track design for the concept that met the operating needs while trying to minimize construction costs and environmental impacts. In order to make the track profile work, cuts in the 40 to 50 ft range were made through existing terrain. Geotechnical exploration was conducted by others to help approximate depths and estimate the quantity of rock excavation, which was expected to be a high-cost item for the project. Structural options were selected for preserving the contractor access road over the new track; drainage was studied to manage stormwater run-off from adjacent property. KOA worked as part of an integrated team with CN’s Design & Construction, Environmental, Real Estate, and Public Works groups to minimize schedule and permitting impacts.

KOA played a pivotal role in the successful execution of the Two Harbors Connector Track project by providing comprehensive construction administration services. Tasked with overseeing the construction process from inception to completion, KOA ensured that the project adhered to plans, specifications, and CN’s requirements. Through effective coordination and communication with stakeholders, KOA facilitated the timely completion of the project while maintaining the highest standards of quality and safety.

Mixed photo sources: KOA and multiple photos shown courtesy of: David Schauer – Flickr | Schauer Photography – FB





Services Provided Civil Rail Rail Design Topo Survey Coordinate Utility Impact Tunnel/Bridge
  • •Selection & Design
Coordination with Geotechnical & Environmental Consultants Construction Administration