County Highway C Construction Administration

Krech Ojard was awarded the construction administration for the repaving of County Trunk Highway C in Douglas County, Wisconsin.

Read more details in the Description Tab below.

COUNTY HIGHWAY C CONSTRUCTION ADMINISTRATION

County Highway C in Douglas County, Wisconsin recently underwent a repavement. The Wisconsin Department of Transportation (WisDOT) hired Krech Ojard to provide construction administration for this project. Krech Ojard served as Project Engineer and site inspector during construction and represented WisDOT.

One problem area at County Highway C included a “Frost Heave” section that had a history of freezing ground water causing bumps in roadway during winter months. During construction it was decided to excavate an additional four feet in areas to find ground water. From the additional excavation, the engineers discovered an underground natural spring running diagonally across road. The solution involved installing a six inch underdrain and sloped native clay below base materials two percent over 600’ of roadway to allow proper drainage to prevent further issues with the road heaving.

The County Highway C project was funded by the American Recovery & Reinvestment Act Stimulus. (ARRA)

  • Pulverize and Relay project that ran 3.66 miles.
  • Inspections included grading, paving, and beam guard installations.

Krech Ojard offers a highly capable multi-disciplined team that provides the professional services needed to deliver successful transportation facility improvements. KOA provides multidisciplinary planning, engineering and program and construction management services for all types of transportation projects.
 





Services Provided Civil Engineering Construction Administration
Client
WisDOT
Location
Douglas Cty, Wisconsin
Completion
2010