Engineering and Consulting

Project

Dock Restoration

Krech Ojard provided marine, civil and structural engineering services related to a damaged dock restoration on the Great Lakes.

Read more details in the Description Tab below.

DOCK RESTORATION

Krech Ojard provided marine, civil and structural engineering services related to a damaged dock restoration on the Great Lakes.

Engineering services included assessment and restoration design for approximately 400ft of failed section of the marine terminal dock and adjacent land structure. The scope of the project included services to assist with permitting of the dock restoration, final design, construction documents, bidding assistance, and construction administration. Along with new steel sheet pile outer bulkhead wall and tieback system, KOA designed new concrete mooring bollards and fendering system and its supports, and bulkhead transition closures.

Project Administration included:

  • Review available plans, layouts, drawings, designs, and reports
  • Coordinate design of dock rehabilitation work with current operational needs of the Owner
  • Provide owner requested information/updates for owner’s purposes




Service Group Marine Engineering Structural Engineering Civil Engineering
Services Marine Assessments and Design Assessments of Damaged Structures Tie-back System Design Bulkhead Design Concrete Mooring Bollards Fendering System Bulkhead Transition Closures Construction Documents Construction Administration
image description
Facebook
YouTube
LinkedIn