Who’s planning your ideas?

Project
Erie Cruise Boat Terminal

Erie Cruise Boat Terminal Investigation

Krech Ojard was retained by the Erie Port Authority to provide an independent investigation of a 500′ long seawall failure at the new Cruise Boat Terminal Pier within the Port of Erie. Krech Ojard became a client representative for the port authority to help prepare for legal proceedings related to the failed structure.

Read more details in the Description Tab below.

ERIE CRUISE BOAT TERMINAL

As a result of the firm’s wide experience with marine structures, Krech Ojard was hired by the Erie Port Authority to provide an independent investigation of a 500′ long seawall failure at the new Erie Cruise Boat Terminal Pier within the Port of Erie.

The technical data and recommendations in this report have been used by the Port Authority to negotiate with the original designer and contractor to resolve responsibility for the sudden seawall failure.

Subsequent to the failure, Krech Ojard has provided plans, specifications, and on-site construction administration services to complete a Demolition Contract to clear the site of the failed seawall in preparation for the new improvements.

Additionally, the Port Authority has retained Krech Ojard to provide ongoing Program Management in planning for reconstruction of the pier site.





Services Provided Marine Engineering Forensic engineering of newly built, yet failed structure Complete analysis/assessment of original design Specifications/Plans Detailed report for legal procedures Demolition and salvage plans Project Management
Client
Erie-Western Pennsylvania Port Authority
Location
Erie, Pennsylvania
image description
Facebook
YouTube
LinkedIn