PORT TERMINAL BULKHEAD DOCK ASSESSMENT, DESIGN OF PARTIAL REFACING AND REHABILITATION
Krech Ojard provided engineering services related to the partial bulkhead dock refacing at a port facility in Chicago, Illinois. The scope of the project included engineering services to support additional installation of approximately 200ft of bulkhead which was similar to 100ft of installation at this site occurring previously in a prototype trial.
Assessments of terrestrial above ground conditions and underwater inspection data were performed to provide complete assessment. Assessments were based on both visual survey and scanning survey data, where underwater scan data was merged with above grade data to provide a holistic view tying visible above grade ground disturbances with adjacent bulkhead wall status in each region.
Engineers provided recommendations for repairs and cost estimates, provided designs for all bulkhead improvements, chosen refacing repairs, and seafloor recommendations to mitigate forward looking stability.