US Highway 63 Reconstruction WisDOT

This highway reconstruction project consisted of milling existing asphaltic surfaces on USH 63 and replacing with new asphalt pavement overlayment.

Read more details in the Description Tab below.

US HIGHWAY 63 RECONSTRUCTION

Krech Ojard was hired by the Wisconsin Department of Transporation (WisDOT) for construction administration services for US Highway 63. The US Highway 63 highway reconstruction project consisted of milling existing asphaltic surface (0.5” on USH 2 for 6.14 mi. and 2.5” on US Highway 63 for 2.57 mi.) and replacing with a new asphalt pavement overlayment(2” on USH 2 and 4” on US Highway 63).

In addition, Type II signs, pavement markings and beamguards were replaced including new Energy Absorbing Terminals. This project was completed in 2013.

Krech Ojard’s multi-disciplinary, team-based approach provided comprehensive services, addressing every aspect of the US Highway 63 project. With an unparalleled ability to respond to the needs and concerns of our clients, KOA’s engineers and other professionals provide cost-effective, real-world solutions to the most unique and challenging projects. From commercial and industrial to highway design projects, our clients have trusted Krech Ojard & Associates to provide creative engineering solutions.





Services Provided Preliminary Plan PER DSR TMP Final PS&E