US HIGHWAYS 2 and 63 RECONSTRUCTION
Krech Ojard was hired by the Wisconsin Department of Transporation (WisDOT) for US Highways 2 and 63 reconstruction. The highway reconstruction project consisted of milling existing asphaltic surface on portions of both US HIGHWAYS 2 and 63 and replacing the surface with a new asphalt pavement overlayment. Project Engineers remained on site to perform construction administration, maintaining design and construction intents, quality and budget, and field documentation.
US Highways 2 and 63 Reconstruction Signage, Markings, and Guardrails: In addition, Type II signs, pavement markings and beamguards were replaced including new Energy Absorbing Terminals. This project was completed in 2013.
Krech Ojard’s civil engineering group provided comprehensive services for this highway resurfacing project, including preliminary engineering reports (PER) to establish how the project will meet WisDOT primary objectives, Design Summary Reports (DSR) which is an outline or summary of engineering and WisDOT decisions for the project with established design parameters, a Transportation Management Plan (TMP) which is an implementation plan for the strategy developed in design phases for temporary traffic control and staging, and wrapping the project up before construction with Plans, Specifications, and Estimates (Final PS&E) which is the final engineering package required to advertise the project for construction bids. Full Construction Administration services were then provided through construction phase for the US Highways 2 and 63 reconstructions.